Goods arriving at Hai Phong port and needed at Gia Binh I the same day? VTM Logistics covers the port-to-Gia Binh I leg with our own vehicle planning and delivery slots, reducing terminal waiting time. Container trucks, lorries and flatbeds are available.
Reference distances from commonly used pickup points:
Gia Binh I Industrial Park is in Bac Ninh and specializes in electronics, textiles, processing, and mechanical engineering. Gia Binh district, Bac Ninh — on National Highway 17, connecting to National Highway 18 and Ring Road 4.
| Location | Dong Cuu, Lang Ngam, and Dai Bai communes, Gia Binh district, Bac Ninh; located on National Highway 17, connecting to National Highway 18 (to Hai Phong port) and adjacent to Ring Road 4 |
| Planned Area | Total planned area ~306.9 ha (industrial land for lease ~180.7 ha); occupancy rate ~5% due to ongoing infrastructure completion, first lots handed over from Q1/2023, construction started 7/2023 |
| Establishment / Operation | Investment policy under Decision 224/QĐ-TTg dated 22/2/2021; established under Decision 127/QĐ-UBND dated 12/4/2021; investor: One Member Limited Liability Company for Investment, Construction and Business of Bac Ninh Industrial Park Infrastructure (Capella Land); infrastructure capital ~VND 2,578 billion, operating term 50 years (2021-2071) |
| Key Industries | Components, electrical and electronic equipment; textiles; processing (food, animal feed, seafood); construction materials; mechanical engineering; high technology; pharmaceuticals; plastic products; supporting industries |
| Transport Connectivity | On National Highway 17, near National Highway 18 and Ring Road 4; about 39-40 km from Hanoi, about 54-57 km from Noi Bai airport, about 70-96 km from Hai Phong port |
Notable enterprises operating in the Industrial Park: NOT VERIFIED specific names — according to the investor (11/2023), 13 registered projects have been attracted, with total capital over 6,000 billion VND (3 FDI projects ~119.2 million USD + 7 domestic projects ~3,000 billion VND)
Cargo types suited to the specific characteristics of the industrial park: Electronic components, raw materials and accessories, textiles, construction materials (dry container, truck)
Demand for container transport from Hai Phong port to Gia Binh I Industrial Park is very high due to the volume of imported raw materials, auxiliary materials and exported finished products of enterprises in the industrial park. VTM Logistics has in-depth knowledge of handling characteristics and vehicle entry/exit registration regulations at industrial parks in Bac Ninh to ensure on-time delivery.
Note: Information on the location, scale and planning of the industrial park is subject to change — please contact VTM for accurate advice on your shipment.
Gia Binh I is located at Gia Binh district, Bac Ninh. The planned area is about 306.9 ha. These characteristics determine the cargo mix, vehicle type and trip planning VTM prepares for each shipment.
Cargo into Gia Binh I mainly serves manufacturing and trading companies. Electronics and components move in 20ft/40ft dry containers with stuffing at the warehouse; machinery, equipment and project cargo use lorries or flatbeds; temperature-sensitive goods use reefer containers. Each cargo group has its own sealing, handling and document requirements, confirmed by dispatch before the trip to Gia Binh I.
Freight rates for the Hai Phong port – Gia Binh I Industrial Park route depend on vehicle type, cargo type, the specific delivery point within the industrial park, and fuel prices. VTM quotes in advance, clearly separating the main freight charges and surcharges (BOT fees, lifting fees, industrial park vehicle registration fees if any) — no unexpected fees.
📞 Call 0903 435 688 or Request a Quote online to receive an accurate quote for your shipment.
On the same Bac Ninh and specializes in electronics corridor, VTM Logistics also serves Yen Phong and Yen Phong. Several delivery points can be combined in one trip to reduce cost.
Related services: transport services · request a quote.
Rates are based on route, vehicle type and number of trips. Lifting and storage charges, if any, are listed separately and quoted in advance.
Exact timing depends on the pickup point; VTM confirms when the trip is booked. For urgent shipments, an earlier truck or a night run can be arranged subject to park rules.
Yes. Partial loads to Gia Binh I are consolidated when timing and route allow, with a handover note and condition photos.
Yes. Flatbeds, low-beds and specialised trailers are available for machinery, equipment and project cargo; dimensions are needed for any route permit.